Exam Sections and Sub-task Objectives


1.0

Manage the network fault management system

 

1.1

Develop a fault management process for a managed network environment collaboratively with the tools team

1.2

Determine the interaction between the fault management system and the ticketing system in collaboration with the tools team

1.3

Identify weaknesses in the network or processes and develop an improvement plan based on a set of metrics from a fault management system

2.0

Manage performance and capacity

 

2.1

Identify spikes and potential trouble spots based on syslog and/or Network Management System (NMS) output

2.2

Develop a plan to solve a particular performance issue based on syslog and/or Network Management System (NMS) output

2.3

Develop a proactive performance plan based on trends, expected performance and a description of future network loads using syslog and/or Network Management System (NMS) historical output

2.4

Develop a plan to solve a capacity problem based on syslog and/or Network Management System (NMS) output

2.5

Develop a plan to establish a baseline and monitor the network in conjunction with the tools and performance groups

2.6

Create baseline network performance in conjunction with engineering and architecture teams

2.7

Monitor the network to look for variances against the baseline

3.0

Manage operations processes

 

3.1

Identify and recommend, based on a set of established processes, Key Performance Indicator (KPI) and a network scenario, which process needs change

3.2

Develop a process improvement plan and/or new Key Performance Indicator (KPI) when identified a process needs improvement

3.3

Collaborate with the process team and NOC management on process development to meet a desired network operational objective

3.4

Develop a specific prototype and test plan for a particular planned network change, working collaboratively with the engineering and design groups

3.5

Develop a detailed operations plan  including metrics and reporting functions for a particular network working collaboratively with the process team

4.0

Troubleshoot and fix reachability and transport problems within the network

 

4.1

Troubleshoot a complex routing problem and, considering the technical aspects, determine the risks and fix it

4.2

Troubleshoot a complex security problem and, considering the technical aspects, determine the risks and fix it

4.3

Troubleshoot a complex rollout problem and, considering the technical aspects, determine the risks and fix it

4.4

Troubleshoot a L2/L3 VPN problem and, considering the technical aspects, determine the risks and fix it

5.0

Identify problems in implementation plans

 

5.1

Find issues of a rollout plan received from engineering before deployment

5.2

Identify mismatches between internal and external customers expectations and reality on a new service rollout plan

5.3

Develop a generic prototype and test plan in conjunction with the engineering and design groups

6.0

Troubleshoot and fix network performance problems

 

6.1

Determine whether to fix or where to escalate a core network fault

6.2

Identify the source of a complex network performance problem

6.3

Troubleshoot a complex network performance problem and, considering the technical aspects, determine the risks and fix it

6.4

Identify a complex application performance problem and isolate it

6.5

Identify a complex computing device (server, call manager, etc - not the network or application) performance problem and isolate it

6.6

Troubleshoot a complex traffic pattern problem and, considering the technical aspects, determine the risks and fix it

6.7

Troubleshoot a complex, chronic performance problem and, considering the technical aspects, determine the risks and fix it


【编辑推荐】

  1. CCIE考查知识:BGP-MED多出口鉴别属性
  2. CCIE Router and Switch v4.0考试攻略
  3. CCIE K2版本考点:IP unnumbered知识复习
【责任编辑:落叶情思 TEL:(010)68476606】



分享到:

关于CCIE SP Operations(SPo的更多文章
2011年3月全国计算机等级考试试题与专家答案

2011年上半年的全国计算机等级考试将在3月26-29日举行,51CTO培[详细]

栏目热门

更多>>

  1. 勇闯IT培训黑色围城
  2. 警剔虚假IT认证培训的伎俩

热点专题

更多>>

读书

Java Web标签应用开发
Java Web程序员直接在JSP页面中书写Java代码的做法,使得页面中混杂有JavaScript、HTML、Java等多种语言的程序代码,可读性差,

51CTO旗下网站

领先的IT技术网站 51CTO 领先的中文存储媒体 WatchStor 中国首个CIO网站 CIOage 中国首家数字医疗网站 HC3i 51CTO学院